Find any Australian or New Zealand company or fund (dead or alive) by using SEARCH above or go directly to the site:
|
|
07 November 2024
Name: | ENVIROMISSION LIMITED (EVM) |
Date of Listing: | 06 August 2001 |
Date of Delisting: | 14 May 2019 |
Stock Exchange Status:
This entity was delisted from the Australian Securities Exchange on 14 May 2019.Legal Status:
ACN: 094 963 238
To our knowledge this is a current registered entity, not in any form of external administration. Subsequent to delisting it may have changed its name. If you have questions about your shareholding they may be taken up with us here: https://www.delisted.com.au/TraceLostSharesLostMoney/index/.Capital Gains Tax (CGT) Status:
The securities in this entity, in our opinion, are of little or no value. We have made that assessment by reference to the circumstances leading to a suspension and/or delisting, the length of a suspension, share trading history and last on-market share price, most recent financial and cash flow statements, prospects (including likelihood of re-financing), and other factors including in particular whether the entity is in external administration. If you are seeking to crystallise a capital loss on your securities, that process can be easily and quickly initiated at our online Worthless Shares facility here: https://www.delisted.com.au/sell-worthless-and-other-securities/.
Updates, corrections, disagreements please email to admin@delisted.com.au
Further information: deListed and InvestoGain are operated by Investogain Pty Limited which is licensed by ASIC as an Australian Financial Services Licensee (AFSL 334036). deListed acquires only securities that it deems to be of little or no value, in circumstances where the holder is unable to sell their securities on-market in the normal manner. This service has been provided online via the company’s website www.delisted.com.au since 2004.
Getting advice: Information provided in this section is of a general nature and applicable only to Australian tax residents who hold their investments on capital account (ie for long-term investment purposes). It has been prepared without taking into account your financial needs or tax situation. Before acting on the information, deListed suggests that you consider whether it is appropriate for your circumstances and recommends that you seek independent legal, financial, or taxation advice.
Disclaimer: The information provided above is to the best of our knowledge accurate as of today. But you should bear in mind that it is of a general nature and does not constitute financial or tax advice. Investogain Pty Limited accepts no liability for any loss arising from reliance on this information, including reliance on information that is no longer current.
REGISTRY:
Computershare Melbourne
Yarra Falls, 452 Johnston Street, Abbotsford VIC 3067
Tel : +61 (0)3 9415 4000 or 1300 850 505 (within Australia)
Fax : +61 3 9473 2500
RegistryWebsite RegistryEmail
Shareholders in this company should consider crystallising a capital loss in 2024/25 by selling their shares. This process is now much easier and quicker. It can be achieved online by entering transaction details here. While, this usually makes good economic sense we recommend you seek professional advice before buying or selling securities, your accountant is probably the best person. | 10/07/2024 |
delisted from the commencement of trading on Tuesday, 14 May 2019 pursuant to Listing rule 17.12. | 14/05/2019 |
we understand this company failed and ASX removed the company from listing because its securities have not been quoted for more than three years | 14/05/2019 |
The company lodges its Appendix 4C & Appendix 4D reports update. | 05/03/2019 |
The company releases the results of its meeting. | 31/01/2019 |
The company releases its Chairman's Address to Shareholders. | 31/01/2019 |
The company provides clarification in relation to the amendment to the previously released notice of meeting. The company discovered the numbering sequence of the items in the Notice of Meeting and accompanying Proxy form did not correspond with each other. The company amended the proxy form item sequence to align with the Notice of Meeting and rereleased the Notice of meeting and Proxy form to avoid potential confusion at the Company's Annual General Meeting. | 11/01/2019 |
The company releases a notice of AGM. The meeting will be held at Tonic House, 386 Flinders Lane, Melbourne at 10.30 am on 31 January 2019. | 02/01/2019 |
The company lodges its Annual Report to shareholders. | 21/12/2018 |
EnviroMission Limited has been granted an extension of time to hold the 2018 Annual General Meeting up to 31 January 2018. EnviroMission applied for the extension in October 2018 and received confirmation from ASIC on Tuesday 13 November the request had been granted; the extension was sought on the grounds the audit for the current financial year was not yet able to be completed, and a funding package EnviroMission is working on, if executed, will require shareholder approval in the near term. | 15/11/2018 |
The company lodges an Appendix 4C - quarterly. | 31/10/2018 |
EnviroMission's release of its Annual Report for the period ending 30 June 2018 will regrettably be delayed. The delay is due to further clarification being sought from Apollo Development LLC concerning capital raising activities for the collaborative arrangement for solar tower development in North America. | 28/09/2018 |
The company's external auditor, MSI Ragg Weir, has merged with Morrows Audit Pty Ltd. MSI has formally resigned as the company's auditors and Morrows have been appointed. There has been no change in audit partner for the engagement. | 27/09/2018 |
The company lodges a Preliminary Final Report. | 12/09/2018 |
The financial report of the company for the year-ending 30 June 2018 will be delayed in its release.EnviroMission Limited expects it will be in a position to release the Full year accounts on or before September 10 2018 and will invariably keep the company's shareholders updated should circumstances relating to the delay require further disclosure. | 31/08/2018 |
Following a scheduled ASX internal system change affecting the Market Announcements Platform, it has been necessary to re-apply the "˜Suspend' session state. This announcement serves to re-confirm the securities of this entity remain suspended. | 06/08/2018 |
The company lodges its Appendix 4C - quarterly. | 31/07/2018 |
The company lodges its Appendix 4C - quarterly. | 30/04/2018 |
EnviroMission has signed a memorandum of understanding (MOU) with Texas based Apollo Development LLC that will supersede the current heads of agreement with Apollo for the assignment of the license to exclusive Solar Tower development rights for Texas. | 24/04/2018 |
The company has executed a financial advisory agreement with Atkins Acuity, a member of the SNC-Lavalin Group, to raise the development and project capital necessary to commercialise the first EnviroMission Solar Tower power station. | 19/04/2018 |
The company lodges its Half Year Accounts. | 28/02/2018 |
The company lodges its Appendix 4C - quarterly report. | 20/02/2018 |
EnviroMission Limited has received a tranche of US$115K from Texas based Solar Tower development proponent, Apollo Development LLC, towards finalisation of a Solar Tower Technology Development Rights License agreement with EnviroMission Limited for the State of Texas. The Development Rights License will be finalized on remittance of the outstanding balance of US$250K from Apollo. | 20/02/2018 |
EnviroMission Limited advises the market the Quarterly Cash Flow disclosure, due for release by 31 January 2018, will be released once US based accountants provide EnviroMission with necessary reports; expectation for release is Monday 5 February 2018. | 01/02/2018 |
The company has received a further tranche of US$115K from Texas based Solar Tower development proponent, Apollo Development LLC, towards finalisation of a Solar Tower Technology Development Rights License agreement with EnviroMission Limited for the State of Texas. The Solar Tower Development Rights Fee will be finalised on receipt of the outstanding balance of US$365K. | 24/01/2018 |
The company releases the results of its meeting. | 23/11/2017 |
The company releases the chairman's address to shareholders. | 23/11/2017 |
The company has received a further US$100,000 payment from Apollo Developments as part consideration of the Solar Tower Technology Development Rights License for Texas, leaving a balance of US$480,000 to complete the agreement. | 08/11/2017 |
The company provides an addendum to its notice of meeting. Page nine (9), paragraph two of the Notice of Meeting incorrectly states "In the 12 months preceding the date of this meeting, the Company has issued no equity securities". EnviroMission failed to disclose the following: 70,775,000 Unlisted Options with an exercise price of AU$0.10 (10 cents) & an expiry date of September 15, 2017 were issued on the 16th December and; 2,000,000 Unlisted Options with an exercise price of AU$0.055 (5.5 cents) & an expiry date of September 15, 2017 were issued on the 16th December 2017. | 08/11/2017 |
The company lodges its Annual Report to shareholders. | 06/11/2017 |
The company lodges its Appendix 4C - quarterly report. | 31/10/2017 |
The financial report for the year ended 30 June 2017 will be released once certainty around funding is in place. The anticipated date for lodgement has now been revised to on or before 23 October 2017. | 17/10/2017 |
The financial report for the year ending 30 June 2017 is currently with the company's external auditors for their final review and signoff. The signoff and the subsequent release of the financial report is expected to be completed during the week ending 13 October 2017. | 06/10/2017 |
The company has received a further US$100,000 payment from Apollo Developments as part consideration of the Solar Tower Technology Development Rights License for Texas, leaving a balance of US$580,000 to complete the agreement. | 03/10/2017 |
The Financial Report of the Company for the year-ending 30 June 2017 will be delayed in its release. Both the Company and its auditors are seeking clarity on the Apollo receivable and other financing arrangements which are anticipated to be resolved before 6 October 2017. | 29/09/2017 |
The company lodges its Preliminary Final Report. | 31/08/2017 |
EnviroMission Limited has received a tranche of US$60K toward the outstanding fees of US$740K required to finalize an exclusive Texas Solar Tower Development Rights agreement with EnviroMission Limited. The balance of US$680K remains due on or before 30 September 2017. Apollo's US$60K provides working capital to EnviroMission whilst EnviroMission seeks to raise the necessary capital to satisfy the requirements of the ASX in relation to EnviroMission's listing status. | 23/08/2017 |
The company lodges its Appendix 4C - quarterly report. | 31/07/2017 |
EnviroMission Limited has revisited the Texas Solar Tower development rights agreement with Texas based entity, Apollo Development LLC, to seek financial satisfaction of Apollo's obligations under the Heads of Agreement with EnviroMission. Apollo's founder and managing partner, Pierre Koshakji, confirmed Apollo's commitment to the agreement and proposed a revised timeline for the balance of US$740K of the US$2M license fee to be paid to EnviroMission in Q3 of 2017. EnviroMission has agreed to the amended timeline in consideration of US$1.24M received to date from Apollo. | 08/06/2017 |
The company lodges its Appendix 4C - quarterly report. | 28/04/2017 |
The company provides a shareholder update. This is intended to provide a narrative to the company's response to ASX questions uploaded to the market on 24 February 2017, and the pathway now underway to address the listing reinstatement requirements of the ASX. | 27/03/2017 |
EnviroMission Limited has advised Mumbai based, RA Solar Pvt Ltd, that the Heads of Agreement for RA Solar to secure Solar Tower development rights in India from EnviroMission, has been terminated by EnviroMission effective 21 March, 2017. | 24/03/2017 |
The company lodges its Half Year Report and Accounts. | 28/02/2017 |
The company lodges an amended Appendix 4C. | 24/02/2017 |
The company issues a response to ASX Query. | 24/02/2017 |
The company lodges its Appendix 4C. | 02/02/2017 |
EnviroMission has sought advice on the protracted execution of the terms of the Heads of Agreement with RA Solar PVT Ltd, to secure from EnviroMission, Solar Tower development rights in the India market; as a result, EnviroMission has required RA Solar to provide a definitive timeline for market release. RA Solar has indicated funds will to be remitted to EnviroMission by Friday 16 December, 2016. EnviroMission has agreed to this final extension of time, however EnviroMission has not waived its rights under the Agreement and reserves the right to exercise those rights in the event RA Solar does not meet this revised commitment. | 12/12/2016 |
EnviroMission has instructed legal counsel to prepare a formal notice of breach and intention to terminate under the terms of the HOA with Japan based funds manager, Valentia Co Ltd., for investment in EnviroMission Limited. Under the terms of the HOA Valentia has seven days from the date of the notice to comply. Valentia has reassured EnviroMission the fund's intended investment of US$10M remains "˜definite' with remittance expected to occur "˜in days'. | 09/12/2016 |
The company releases the results of its meeting with corrections. | 29/11/2016 |
The company releases the results of its meeting. | 25/11/2016 |
The company releases the Chairman's Address to Shareholders. | 25/11/2016 |
The company lodges its Appendix 4C - quarterly report. | 02/11/2016 |
Notice is hereby given that an Annual General Meeting of EnviroMission Limited's shareholders will be held at Morgans, 401 Collins Street Melbourne on 25 November 2016 at 10.30 am. | 02/11/2016 |
The company has received an amended investment timetable from Japan based funds manager, Valentia Development Co, that will roll the planned tranche of ¥10M into an initial larger tranche of US$1M that is expected to be received into EnviroMission's account the week commencing 3 October, 2016. EnviroMission has further been advised that the balance of the Valentia Fund's first US$10M investment is now expected to be received by 21 October 2016. The remaining US$5M Valentia Fund commitment to bring the overall investment to US$15M is expected to be received within seven days of completion of the first stage investment of US$10M remittance. | 03/10/2016 |
The company releases its Appendix 4G Key to Disclosures - Annual Report. | 30/09/2016 |
The company lodges its Annual Report to shareholders. | 30/09/2016 |
RA Solar has advised EnviroMission that as a result of "˜consultation with their legal counsel and bankers' RA can now confirm a definitive timetable for payment of the license fee due to EnviroMission under the terms of a 2015 Heads of Agreement that proposes the assignment of Solar Tower development rights for India to RA under arrangement with EnviroMission. | 20/09/2016 |
Valentia Development Co, has advised EnviroMission it remains committed to investing an initial US$10M in EnviroMission for ongoing commercialisation of Solar Tower technology on or prior to 30 September 2016. The tranche of ¥10M expected for remittance the week commencing 5 September, 2016 has been pushed out to the week ending 23 September 2016. The last tranche of US$5M of the previously announced investment of US$15M, is expected to be received within seven days of the initial US$10M being received by EnviroMission. | 20/09/2016 |
EnviroMission updated the market on Friday 2 September that the first tranche of the anticipated Valentia investment would be US$1M set down for remittance in the week commencing 4 September; this amount was incorrectly stated and an error of currency conversion that was made by and recognised by EnviroMission prior to this market update. "The central tenant of the Valentia investment update on Friday 2 September was a continuous disclosure update to confirm progress with Valentia's planned investment in EnviroMission with advice that a financial first stage remittance would be made to underscore Valentia's commitment to the delayed EnviroMission investment," EnviroMission Chief Executive, Roger Davey said, adding that "despite certain setbacks experienced by the fund over the course of its fund raising Valentia is now confident the transaction will be completed in the revised timeframe, with the initial ¥10M investment intended as a sign of goodwill to ensure EnviroMission has working capital ahead of the larger investment being made." | 05/09/2016 |
The company d has received advice from Valentia chairman, Takeshi Ono, that the first tranche of US$1M, of a previously announced US$10M cornerstone investment in EnviroMission Limited will occur the week commencing 4 September 2016. The balance of US$9M will be completed as previously announced, by the 30 September 2016. A last tranche of US$5M to complete the previously announced overall investment of US$15M, is anticipated to be received within seven days of US$10M being received by EnviroMission. | 02/09/2016 |
The company lodges its Preliminary Final Report. | 31/08/2016 |
The company has received further advice from Japan based funds manager, Valentia Co Ltd., outlining their proposed investment remittance advice to conclude the terms of the Heads of Agreement for investment in EnviroMission Limited. The terms of the Heads of Agreement are unchanged with the first tranche (US$10M) of the previously announced US$15M investment to be placed with EnviroMission Limited at the higher consideration of US$0.20 per ordinary share or market, subject to ASX Listing Rules. | 12/08/2016 |
The company lodges its Appendix 4C - quarterly report. | 29/07/2016 |
The company has received advice from Japan based funds manager, Valentia Co Ltd., their investment in EnviroMission remains "˜on-track' driven by Valentia's "˜full commitment' to the terms of the Heads of Agreement for direct investment in EnviroMission Limited. Initial funds of US$10M due to be remitted on 11 July were delayed in the country of origin awaiting final approval; all arrangements with the source of the funds and the receiving banks are complete and in readiness for remittance to Valentia for investment in EnviroMission. | 15/07/2016 |
The company has received an update from RA Solar regarding the progress of RA's capital raising for Solar Tower development in India, in so far that capital is material to RA's ability to meet the commercial terms of the India Solar Tower Development Rights License agreement with EnviroMission Limited. RA expects the funds being raised for Solar Tower development in India will flow to RA by "week's end", at which time RA will immediately settle the financial terms of the development rights Heads of Agreement with EnviroMission. | 05/07/2016 |
EnviroMission Limited received an investment timetable update from Japan based funds manager Valentia Co Ltd. (3 July, 2016), informing EnviroMission it can expect US$5M within 7 days of receipt of an initial transfer of US$10M that is due to be remitted to EnviroMission on 11 July 2016, to complete Valentia's US15M investment proposed under an Heads of Agreement with EnviroMission for Solar Tower commercialisation. | 04/07/2016 |
Takeshi Ono, Chairman of Valentia Co. Limited advised EnviroMission Limited in writing on June 29th that Valentia will execute a fund transfer of US$ 10 million to EnviroMission on July 11. They apologize for the various setbacks, and seek the understanding of all concerned, including shareholders. | 30/06/2016 |
EnviroMission Limited has been advised by Japan based funds manger, Valentia Co. Ltd, that funds expected to be invested in EnviroMission Limited are in the pipeline and have assured EnviroMission the commitment to the US$15M funding is "˜underway and EnviroMission remains Valentia's investment priority'. EnviroMission anticipates receipt of Valentia's investment on or before June 30, 2016. | 24/06/2016 |
EnviroMission Limited has been advised by the proposed India market Solar Tower developer, RA Solar, that a delay to the flow of funds for RA Solar's Solar Tower development objectives in India is a result of internal regulatory and statutory issues relating to the inter-market funds transfer. The European remitting bank have advised RA Solar that funds will be transferred for completion by the end of this quarter. | 14/06/2016 |
The audit process relating to the Union Leader Development Ltd transfer of investment funds has been completed and signed off, clearing the way for transfer of funds from Europe to Hong Kong for distribution to commence on 14 June 2016. Hang Seng bank in Hong Kong is on standby to receive funds cleared from Europe, and the portion designated for the Valentia's investment in EnviroMission will be transferred to Valentia's funds management account at the Development Bank of Singapore (Singapore) for immediate transfer to the EnviroMission Limited US$ account. | 14/06/2016 |
EnviroMission Limited has received an investment status update from Valentia Chairman, Takeshi Ono, stating "˜all that stands between the remittances of the investment funds' from Union Lead Development Ltd to Valentia for investment in EnviroMission Limited, is Union Lead Development's audit signoff that is expected this week. Hang Seng bank in Hong Kong is on standby to receive funds from Europe for the investment portion designated for EnviroMission to be transferred to Valentia's funds management account at the Development Bank of Singapore (Singapore) for immediate transfer of the EnviroMission Limited investment to the EnviroMission US$ account. On receipt of the investment funds from Valentia, EnviroMission will issue ordinary free trading EnviroMission Limited securities and attaching options subject to ASX Listing Rules. | 08/06/2016 |
EnviroMission Limited has been advised by Solar Tower Development Rights proponent, RA Solar, that funds are expected within days and a portion of those funds will be applied to all or part of the amount due to secure the Solar Tower development rights for India under an executed Heads of Agreement with EnviroMission. | 01/06/2016 |
The company has been updated about the proposed investment of US$15M in EnviroMission from Japan based fund manager, Valentia Co Ltd, that advised the funding preparations are "˜complete' and transfer of funds to EnviroMission are "˜scheduled for this coming week'. | 01/06/2016 |
The company issues a response to ASX query. | 17/05/2016 |
The securities of Enviromission Limited (the "Company") will be suspended from official quotation immediately, pending the Company's response to an ASX query | 13/05/2016 |
listed entity carried for record purposes only | 01/07/2004 |
Shareholders in this company should consider crystallising a capital loss in 2024/25 by selling their shares. This process is now much easier and quicker. It can be achieved online by entering transaction details here. While, this usually makes good economic sense we recommend you seek professional advice before buying or selling securities, your accountant is probably the best person. | 10/07/2024 |
delisted from the commencement of trading on Tuesday, 14 May 2019 pursuant to Listing rule 17.12. | 14/05/2019 |
we understand this company failed and ASX removed the company from listing because its securities have not been quoted for more than three years | 14/05/2019 |
The company lodges its Appendix 4C & Appendix 4D reports update. | 05/03/2019 |
The company releases the results of its meeting. | 31/01/2019 |
The company releases its Chairman's Address to Shareholders. | 31/01/2019 |
The company provides clarification in relation to the amendment to the previously released notice of meeting. The company discovered the numbering sequence of the items in the Notice of Meeting and accompanying Proxy form did not correspond with each other. The company amended the proxy form item sequence to align with the Notice of Meeting and rereleased the Notice of meeting and Proxy form to avoid potential confusion at the Company's Annual General Meeting. | 11/01/2019 |
The company releases a notice of AGM. The meeting will be held at Tonic House, 386 Flinders Lane, Melbourne at 10.30 am on 31 January 2019. | 02/01/2019 |
The company lodges its Annual Report to shareholders. | 21/12/2018 |
EnviroMission Limited has been granted an extension of time to hold the 2018 Annual General Meeting up to 31 January 2018. EnviroMission applied for the extension in October 2018 and received confirmation from ASIC on Tuesday 13 November the request had been granted; the extension was sought on the grounds the audit for the current financial year was not yet able to be completed, and a funding package EnviroMission is working on, if executed, will require shareholder approval in the near term. | 15/11/2018 |
The company lodges an Appendix 4C - quarterly. | 31/10/2018 |
EnviroMission's release of its Annual Report for the period ending 30 June 2018 will regrettably be delayed. The delay is due to further clarification being sought from Apollo Development LLC concerning capital raising activities for the collaborative arrangement for solar tower development in North America. | 28/09/2018 |
The company's external auditor, MSI Ragg Weir, has merged with Morrows Audit Pty Ltd. MSI has formally resigned as the company's auditors and Morrows have been appointed. There has been no change in audit partner for the engagement. | 27/09/2018 |
The company lodges a Preliminary Final Report. | 12/09/2018 |
The financial report of the company for the year-ending 30 June 2018 will be delayed in its release.EnviroMission Limited expects it will be in a position to release the Full year accounts on or before September 10 2018 and will invariably keep the company's shareholders updated should circumstances relating to the delay require further disclosure. | 31/08/2018 |
Following a scheduled ASX internal system change affecting the Market Announcements Platform, it has been necessary to re-apply the "˜Suspend' session state. This announcement serves to re-confirm the securities of this entity remain suspended. | 06/08/2018 |
The company lodges its Appendix 4C - quarterly. | 31/07/2018 |
The company lodges its Appendix 4C - quarterly. | 30/04/2018 |
EnviroMission has signed a memorandum of understanding (MOU) with Texas based Apollo Development LLC that will supersede the current heads of agreement with Apollo for the assignment of the license to exclusive Solar Tower development rights for Texas. | 24/04/2018 |
The company has executed a financial advisory agreement with Atkins Acuity, a member of the SNC-Lavalin Group, to raise the development and project capital necessary to commercialise the first EnviroMission Solar Tower power station. | 19/04/2018 |
The company lodges its Half Year Accounts. | 28/02/2018 |
The company lodges its Appendix 4C - quarterly report. | 20/02/2018 |
EnviroMission Limited has received a tranche of US$115K from Texas based Solar Tower development proponent, Apollo Development LLC, towards finalisation of a Solar Tower Technology Development Rights License agreement with EnviroMission Limited for the State of Texas. The Development Rights License will be finalized on remittance of the outstanding balance of US$250K from Apollo. | 20/02/2018 |
EnviroMission Limited advises the market the Quarterly Cash Flow disclosure, due for release by 31 January 2018, will be released once US based accountants provide EnviroMission with necessary reports; expectation for release is Monday 5 February 2018. | 01/02/2018 |
The company has received a further tranche of US$115K from Texas based Solar Tower development proponent, Apollo Development LLC, towards finalisation of a Solar Tower Technology Development Rights License agreement with EnviroMission Limited for the State of Texas. The Solar Tower Development Rights Fee will be finalised on receipt of the outstanding balance of US$365K. | 24/01/2018 |
The company releases the results of its meeting. | 23/11/2017 |
The company releases the chairman's address to shareholders. | 23/11/2017 |
The company has received a further US$100,000 payment from Apollo Developments as part consideration of the Solar Tower Technology Development Rights License for Texas, leaving a balance of US$480,000 to complete the agreement. | 08/11/2017 |
The company provides an addendum to its notice of meeting. Page nine (9), paragraph two of the Notice of Meeting incorrectly states "In the 12 months preceding the date of this meeting, the Company has issued no equity securities". EnviroMission failed to disclose the following: 70,775,000 Unlisted Options with an exercise price of AU$0.10 (10 cents) & an expiry date of September 15, 2017 were issued on the 16th December and; 2,000,000 Unlisted Options with an exercise price of AU$0.055 (5.5 cents) & an expiry date of September 15, 2017 were issued on the 16th December 2017. | 08/11/2017 |
The company lodges its Annual Report to shareholders. | 06/11/2017 |
The company lodges its Appendix 4C - quarterly report. | 31/10/2017 |
The financial report for the year ended 30 June 2017 will be released once certainty around funding is in place. The anticipated date for lodgement has now been revised to on or before 23 October 2017. | 17/10/2017 |
The financial report for the year ending 30 June 2017 is currently with the company's external auditors for their final review and signoff. The signoff and the subsequent release of the financial report is expected to be completed during the week ending 13 October 2017. | 06/10/2017 |
The company has received a further US$100,000 payment from Apollo Developments as part consideration of the Solar Tower Technology Development Rights License for Texas, leaving a balance of US$580,000 to complete the agreement. | 03/10/2017 |
The Financial Report of the Company for the year-ending 30 June 2017 will be delayed in its release. Both the Company and its auditors are seeking clarity on the Apollo receivable and other financing arrangements which are anticipated to be resolved before 6 October 2017. | 29/09/2017 |
The company lodges its Preliminary Final Report. | 31/08/2017 |
EnviroMission Limited has received a tranche of US$60K toward the outstanding fees of US$740K required to finalize an exclusive Texas Solar Tower Development Rights agreement with EnviroMission Limited. The balance of US$680K remains due on or before 30 September 2017. Apollo's US$60K provides working capital to EnviroMission whilst EnviroMission seeks to raise the necessary capital to satisfy the requirements of the ASX in relation to EnviroMission's listing status. | 23/08/2017 |
The company lodges its Appendix 4C - quarterly report. | 31/07/2017 |
EnviroMission Limited has revisited the Texas Solar Tower development rights agreement with Texas based entity, Apollo Development LLC, to seek financial satisfaction of Apollo's obligations under the Heads of Agreement with EnviroMission. Apollo's founder and managing partner, Pierre Koshakji, confirmed Apollo's commitment to the agreement and proposed a revised timeline for the balance of US$740K of the US$2M license fee to be paid to EnviroMission in Q3 of 2017. EnviroMission has agreed to the amended timeline in consideration of US$1.24M received to date from Apollo. | 08/06/2017 |
The company lodges its Appendix 4C - quarterly report. | 28/04/2017 |
The company provides a shareholder update. This is intended to provide a narrative to the company's response to ASX questions uploaded to the market on 24 February 2017, and the pathway now underway to address the listing reinstatement requirements of the ASX. | 27/03/2017 |
EnviroMission Limited has advised Mumbai based, RA Solar Pvt Ltd, that the Heads of Agreement for RA Solar to secure Solar Tower development rights in India from EnviroMission, has been terminated by EnviroMission effective 21 March, 2017. | 24/03/2017 |
The company lodges its Half Year Report and Accounts. | 28/02/2017 |
The company lodges an amended Appendix 4C. | 24/02/2017 |
The company issues a response to ASX Query. | 24/02/2017 |
The company lodges its Appendix 4C. | 02/02/2017 |
EnviroMission has sought advice on the protracted execution of the terms of the Heads of Agreement with RA Solar PVT Ltd, to secure from EnviroMission, Solar Tower development rights in the India market; as a result, EnviroMission has required RA Solar to provide a definitive timeline for market release. RA Solar has indicated funds will to be remitted to EnviroMission by Friday 16 December, 2016. EnviroMission has agreed to this final extension of time, however EnviroMission has not waived its rights under the Agreement and reserves the right to exercise those rights in the event RA Solar does not meet this revised commitment. | 12/12/2016 |
EnviroMission has instructed legal counsel to prepare a formal notice of breach and intention to terminate under the terms of the HOA with Japan based funds manager, Valentia Co Ltd., for investment in EnviroMission Limited. Under the terms of the HOA Valentia has seven days from the date of the notice to comply. Valentia has reassured EnviroMission the fund's intended investment of US$10M remains "˜definite' with remittance expected to occur "˜in days'. | 09/12/2016 |
The company releases the results of its meeting with corrections. | 29/11/2016 |
The company releases the results of its meeting. | 25/11/2016 |
The company releases the Chairman's Address to Shareholders. | 25/11/2016 |
The company lodges its Appendix 4C - quarterly report. | 02/11/2016 |
Notice is hereby given that an Annual General Meeting of EnviroMission Limited's shareholders will be held at Morgans, 401 Collins Street Melbourne on 25 November 2016 at 10.30 am. | 02/11/2016 |
The company has received an amended investment timetable from Japan based funds manager, Valentia Development Co, that will roll the planned tranche of ¥10M into an initial larger tranche of US$1M that is expected to be received into EnviroMission's account the week commencing 3 October, 2016. EnviroMission has further been advised that the balance of the Valentia Fund's first US$10M investment is now expected to be received by 21 October 2016. The remaining US$5M Valentia Fund commitment to bring the overall investment to US$15M is expected to be received within seven days of completion of the first stage investment of US$10M remittance. | 03/10/2016 |
The company releases its Appendix 4G Key to Disclosures - Annual Report. | 30/09/2016 |
The company lodges its Annual Report to shareholders. | 30/09/2016 |
RA Solar has advised EnviroMission that as a result of "˜consultation with their legal counsel and bankers' RA can now confirm a definitive timetable for payment of the license fee due to EnviroMission under the terms of a 2015 Heads of Agreement that proposes the assignment of Solar Tower development rights for India to RA under arrangement with EnviroMission. | 20/09/2016 |
Valentia Development Co, has advised EnviroMission it remains committed to investing an initial US$10M in EnviroMission for ongoing commercialisation of Solar Tower technology on or prior to 30 September 2016. The tranche of ¥10M expected for remittance the week commencing 5 September, 2016 has been pushed out to the week ending 23 September 2016. The last tranche of US$5M of the previously announced investment of US$15M, is expected to be received within seven days of the initial US$10M being received by EnviroMission. | 20/09/2016 |
EnviroMission updated the market on Friday 2 September that the first tranche of the anticipated Valentia investment would be US$1M set down for remittance in the week commencing 4 September; this amount was incorrectly stated and an error of currency conversion that was made by and recognised by EnviroMission prior to this market update. "The central tenant of the Valentia investment update on Friday 2 September was a continuous disclosure update to confirm progress with Valentia's planned investment in EnviroMission with advice that a financial first stage remittance would be made to underscore Valentia's commitment to the delayed EnviroMission investment," EnviroMission Chief Executive, Roger Davey said, adding that "despite certain setbacks experienced by the fund over the course of its fund raising Valentia is now confident the transaction will be completed in the revised timeframe, with the initial ¥10M investment intended as a sign of goodwill to ensure EnviroMission has working capital ahead of the larger investment being made." | 05/09/2016 |
The company d has received advice from Valentia chairman, Takeshi Ono, that the first tranche of US$1M, of a previously announced US$10M cornerstone investment in EnviroMission Limited will occur the week commencing 4 September 2016. The balance of US$9M will be completed as previously announced, by the 30 September 2016. A last tranche of US$5M to complete the previously announced overall investment of US$15M, is anticipated to be received within seven days of US$10M being received by EnviroMission. | 02/09/2016 |
The company lodges its Preliminary Final Report. | 31/08/2016 |
The company has received further advice from Japan based funds manager, Valentia Co Ltd., outlining their proposed investment remittance advice to conclude the terms of the Heads of Agreement for investment in EnviroMission Limited. The terms of the Heads of Agreement are unchanged with the first tranche (US$10M) of the previously announced US$15M investment to be placed with EnviroMission Limited at the higher consideration of US$0.20 per ordinary share or market, subject to ASX Listing Rules. | 12/08/2016 |
The company lodges its Appendix 4C - quarterly report. | 29/07/2016 |
The company has received advice from Japan based funds manager, Valentia Co Ltd., their investment in EnviroMission remains "˜on-track' driven by Valentia's "˜full commitment' to the terms of the Heads of Agreement for direct investment in EnviroMission Limited. Initial funds of US$10M due to be remitted on 11 July were delayed in the country of origin awaiting final approval; all arrangements with the source of the funds and the receiving banks are complete and in readiness for remittance to Valentia for investment in EnviroMission. | 15/07/2016 |
The company has received an update from RA Solar regarding the progress of RA's capital raising for Solar Tower development in India, in so far that capital is material to RA's ability to meet the commercial terms of the India Solar Tower Development Rights License agreement with EnviroMission Limited. RA expects the funds being raised for Solar Tower development in India will flow to RA by "week's end", at which time RA will immediately settle the financial terms of the development rights Heads of Agreement with EnviroMission. | 05/07/2016 |
EnviroMission Limited received an investment timetable update from Japan based funds manager Valentia Co Ltd. (3 July, 2016), informing EnviroMission it can expect US$5M within 7 days of receipt of an initial transfer of US$10M that is due to be remitted to EnviroMission on 11 July 2016, to complete Valentia's US15M investment proposed under an Heads of Agreement with EnviroMission for Solar Tower commercialisation. | 04/07/2016 |
Takeshi Ono, Chairman of Valentia Co. Limited advised EnviroMission Limited in writing on June 29th that Valentia will execute a fund transfer of US$ 10 million to EnviroMission on July 11. They apologize for the various setbacks, and seek the understanding of all concerned, including shareholders. | 30/06/2016 |
EnviroMission Limited has been advised by Japan based funds manger, Valentia Co. Ltd, that funds expected to be invested in EnviroMission Limited are in the pipeline and have assured EnviroMission the commitment to the US$15M funding is "˜underway and EnviroMission remains Valentia's investment priority'. EnviroMission anticipates receipt of Valentia's investment on or before June 30, 2016. | 24/06/2016 |
EnviroMission Limited has been advised by the proposed India market Solar Tower developer, RA Solar, that a delay to the flow of funds for RA Solar's Solar Tower development objectives in India is a result of internal regulatory and statutory issues relating to the inter-market funds transfer. The European remitting bank have advised RA Solar that funds will be transferred for completion by the end of this quarter. | 14/06/2016 |
The audit process relating to the Union Leader Development Ltd transfer of investment funds has been completed and signed off, clearing the way for transfer of funds from Europe to Hong Kong for distribution to commence on 14 June 2016. Hang Seng bank in Hong Kong is on standby to receive funds cleared from Europe, and the portion designated for the Valentia's investment in EnviroMission will be transferred to Valentia's funds management account at the Development Bank of Singapore (Singapore) for immediate transfer to the EnviroMission Limited US$ account. | 14/06/2016 |
EnviroMission Limited has received an investment status update from Valentia Chairman, Takeshi Ono, stating "˜all that stands between the remittances of the investment funds' from Union Lead Development Ltd to Valentia for investment in EnviroMission Limited, is Union Lead Development's audit signoff that is expected this week. Hang Seng bank in Hong Kong is on standby to receive funds from Europe for the investment portion designated for EnviroMission to be transferred to Valentia's funds management account at the Development Bank of Singapore (Singapore) for immediate transfer of the EnviroMission Limited investment to the EnviroMission US$ account. On receipt of the investment funds from Valentia, EnviroMission will issue ordinary free trading EnviroMission Limited securities and attaching options subject to ASX Listing Rules. | 08/06/2016 |
EnviroMission Limited has been advised by Solar Tower Development Rights proponent, RA Solar, that funds are expected within days and a portion of those funds will be applied to all or part of the amount due to secure the Solar Tower development rights for India under an executed Heads of Agreement with EnviroMission. | 01/06/2016 |
The company has been updated about the proposed investment of US$15M in EnviroMission from Japan based fund manager, Valentia Co Ltd, that advised the funding preparations are "˜complete' and transfer of funds to EnviroMission are "˜scheduled for this coming week'. | 01/06/2016 |
The company issues a response to ASX query. | 17/05/2016 |
The securities of Enviromission Limited (the "Company") will be suspended from official quotation immediately, pending the Company's response to an ASX query | 13/05/2016 |
listed entity carried for record purposes only | 01/07/2004 |
Your browser may reflect a date of printing in American format.
I am trying to contact this company can anyone out there give me details. roncbeel@hotmail.com | 12/02/2020 11:49:37 |
I don\'t think that the company failed per se but the ASX notice on 13/05/2019 says:
EnviroMission Limited (ASX: EVM) (\"the Company\") wishes to advise that it has been unable to meet the requirements for relisting on the ASX and will be removed from the Official List of the ASX from the commencement of trading on Tuesday,14 May 2019. It will then presuambly continue with its soporofic existence. | 13/06/2019 15:00:53 |
They don\'t bother to reply to investors emails, no news, nothing from directors, seriously what is going on? I guess they hope we all forget about our stocks? It\'s been nearly two years folks... The stock price better jump to $100 a share when you reopen the company so we can get some of our money back. | 09/03/2019 04:08:41 |
It seems the directors are paying themselves handsomely until you hopefully forget about your stocks. The company seems to be receiving plenty of chash. There is very much a lack of information on all of this. | 19/02/2018 16:45:12 |
Can anyone plz tell me why EVM suspended and when would be back on the market. | 06/02/2017 15:09:33 |
DATE | DIRECTOR | NATURE | NUMBER | PRICE | AMOUNT |
---|---|---|---|---|---|
09/09/2016 | Andrew Draffin | On market | 160,000 | $0.110 | $17,406 |
04/12/2013 | Andrew Draffin | On market | 250,000 | $0.082 | $20,500 |
NAME | TITLE | DATE OF APPT |
---|---|---|
Roger Davey | Executive Chairman, CEO | 31/07/2001 |
Andrew Draffin | Director, CFO, Company Secretary | 27/06/2011 |
Pierre Koshakji | Director | 05/12/2018 |
Yue Tang | Alternate Director | 08/06/2004 |
Date of first appointment, title may have changed.
NAME | TITLE | DATE OF APPOINTMENT | DATE OF RESIGNATION |
---|---|---|---|
David Galbally | Director | 26/04/2005 | 06/09/2016 |
Date of first appointment, title may have changed.
Contact Us | Financial Services Guide | Privacy Policy
This website is owned and operated by Investogain Pty Limited.
ABN 88 129 443 447 | AFSL 334036
Information provided is of a general nature and not for trading or advice.
Copyright © 2002-2024 Investogain Pty Limited. All rights reserved.